附着式升降脚手架 / 物料提升机 03 / Core Product
Climbing Scaffold & Material Hoist
Attached Lifting Scaffold & Material Hoist
Integrated climbing systems that lift with the building
Our attached lifting scaffolds climb automatically with the structure, eliminating re-erection cycles and freeing your tower crane for lifting. PLC-synchronized climbing with multiple safety locks keeps crews protected at every elevation. Paired with SS-series material hoists, the system provides complete vertical logistics for high-rise shells.
Technical Specifications
Key parameters
- Climbing speed
- 0.5 m/min (synchronized)
- Platform width
- 0.6 – 1.2 m
- Support points
- Synchronized multi-point
- Material hoist
- SS100/100 – SS120/120
- Control
- PLC synchronized, safety-locked
- Standards
- JGJ / GB
Full specification sheet, drawings and datasheet available on request.
Why it works
- Floor-by-floor self-climbing, no tower crane needed
- PLC-synchronized climbing with dual safety locks
- Reduce scaffold labour cost by up to 70%
- Material hoists with overload protection